Lynhales Nursing Home

BIOMASS BOILER SYSTEM REPLACES 7 OIL BOILERS, SAVES 40% FUEL COSTS & REDUCES CO2 BY 96%

SUMMARY OF PROJECT:

  • 2 x 99kw Lindner & Sommerauer biomass boilers and 1 x 150kw biomass boiler.
  • Distribution pipework including all internal connections to existing heating systems
  • Runs on wood pellets

KEY OUTCOMES:

  • Biomass Fuel Cost Reduction; 20-40% over oil.
  • CO2  Reduction; 96% (Source; Biomass Energy Centre)
  • *RHI Accreditation; Soon to be RHI accredited and will generate additional revenue stream for the nursing home.*

FINANCIAL BENEFITS:

  • *RHI Payments and fuel cost savings make the project both sustainable and financially viable.*

ABOUT US

MJS Energy are a Midlands-based
mechanical, plumbing and electrical
design and installation company.
MJS Energy regularly carry out installations for other renewable energy companies throughout the UK, offering them access to an experienced team of installers, builders and groundworkers to assist with their project delivery if additional capacity is required.

KEY FACTS*

Project included:

2 x Lindner & Sommerauer 99kw boilers in cascade and a 150kw biomass boiler system. Flue system, thermal store and distribution pipework including connections to heat exchangers.

Fuel Consumption:

104 Tonnes of wood pellets per annum.

Fuel Cost Saving:

Wood pellets 20-40% vs oil. This would be approx £8,000 per annum.

CO2 Saving:

Up to 98% or 154 tonnes vs heating oil (Source; Biomass Energy Centre)

RHI Payments:

A project of this size would gain approx £38,140 every year for 20 years, index linked to inflation. “The Commercial Renewable Heat Incentive (RHI) Scheme closed to new applications on the 31st of March 2020 – it has been replaced with the Boiler Upgrade Scheme (BUS) grant. Please contact the office for details.”

Total Project Price:

£225,000

Payback Period:

5-6 years (combining RHI income
& fuel cost savings)
. *Financial information not specific to this project – figures are based on an average of several typical products of this size. Current information on RHI payments for guidance only, not to be considered a guarantee.

Background

Lynhales Hall Nursing Home is set in seven acres of wood and parkland with ornamental lakes. The Manor House, now refurbished, was built in circa 1588 and extended in the Georgian Period.
The Main House comprises two floors of single and shared rooms, the majority of which have en-suite facilities providing accommodation for 53 residents.

The Requirement

The driver for the customer was the reduction of a large annual oil bill to heat the nursing homes and offices.
The system would need to replace 7 ageing and inefficient oil boilers.

Complete Biomass District Heating Package

Wye Valley Energy carried out a turnkey project including all ground works, trenching, primary and secondary connections, erecting of buildings and all civils.
We also organise and oversaw the construction of a new building to house the biomass boilers and fuel store.

The Renewable Heat Incentive

As well as fuel cost savings of at least 20- 40%, the installation will soon be accredited into the Renewable Heat incentive. Once approved, the client will start to receive quarterly RHI payments.
The RHI Payments and the fuel cost saving will ensure that the project is sustainable and financially viable.

Biomass Heating Summery

The District heating scheme included;

  • The District heating scheme included; 2 x 99kw biomass boilers in cascade and 1 150kw boiler.
  • 3 x 4m pellet delivery augers.
  • 1 x 4,000 ltr and 1 x 5,000 ltr buffer.
  • 2 heat exchangers and 4 x class 2 RHI eligible ultrasonic heat meters complete with certification.
  • Biomass boiler linked to existing heating and hot water system.
  • Fully automated fuel delivery system
  • High efficiency, low energy main system pump.
  • Full assistance with RHI application including schematic drawings.
  • Commissioning, programming and end user training.
Contact Us to Discuss
Your Biomass Project

*“The Commercial Renewable Heat Incentive (RHI) Scheme closed to new applications on the 31st of March 2020 – it has been replaced with the Boiler Upgrade Scheme (BUS) grant. Please contact the office for details.”*